Wastewater Sludge Transfer – Montana Municipality

Client: City of Billings, MT
Industry: Wastewater Treatment
Scope: Supplied and installed progressive cavity pumps for thick sludge transfer
Challenge: The facility was facing recurring pump failures due to abrasive sludge with high solids content
Solution: Mobyflo provided abrasion-resistant pumps with hardened rotors and stators for reliable 24/7 operation
Result: 40% reduction in maintenance costs and zero breakdowns over 9 months of operation
Services Provided: Equipment selection, shipping, installation consultation, and custom spare parts supply
Products Used: Progressive cavity pump with reinforced stator and seal package
Client Feedback: “Mobyflo’s pump system eliminated downtime and delivered exactly what we needed.